Airport Construction/Expansion Tracking Thread

Chengdu Tianfu International Airport (ZUTF) is still being expanded.


Tianfu Airport will build three more runways, two of which are parallel to the existing 01/19 02/20 as departure and arrival. The other one is parallel to 11, as a depature.

In addition, an almost identical building will be built in the south of the current terminal as Terminal 3 and Terminal 4.

Plan for the future, T1 as international, T2/3/4 as domestic


In this period, Chengdu Tianfu International Airport will build three runways of “two vertical and one horizontal”, a terminal of 710,000 square meters and corresponding supporting facilities, and simultaneously build air traffic control projects, oil supply projects, airline bases and mail processing centers to meet the needs of an annual passenger throughput of 60 million passengers and 1.3 million tons of cargo and mail throughput. Ask. In the long term, it is planned to build six “four vertical and two horizontal” runways and a terminal of 1.4 million square meters to meet the needs of an annual passenger throughput of 120 million and a cargo and mail throughput of 2.8 million tons.


Red: Now. Blue: Future




Source: https://news.qq.com/rain/a/20240605A0AST100
Source:https://www.cdccic.com/show_36348.htm
Source:涉及天府机场二期项目!四川最新发文_腾讯新闻
Source:Construction has begun in the south of the terminal at the time of aircraft shooting.
Source:Exhibition board in the terminal

4 Likes

Those mock ups are absolutely incredible.

2 Likes